Why manual measurement keeps failing
Buildings are not square, floors are not level, and nothing built before 1990 matches its drawings.
Manual measurement records what you decided to record. Every return visit for a forgotten dimension costs an hour of travel for two minutes of work, and on an occupied property it costs goodwill as well.
The other trap is compounding error. Room by room measurement accumulates, so a floor plan built from twenty separate room sketches often does not close.